Tashkent–Samarkand high-speed rail line
Tashkent – Samarkand High speed Railway | |
---|---|
Afrosiyob high-speed train
|
|
Overview | |
Type | High-speed railway |
System | Uzbekistan Railways |
Status | passenger service |
Termini | Tashkent Railway Station, Tashkent Samarkand Railway Station, Samarkand |
Operation | |
Opened | 8 October 2011 |
Owner | Uzbekistan Railways |
Operator(s) | Uzbekistan Railways |
Character | Passenger |
Rolling stock | Talgo 250 |
Technical | |
Line length | 344 km (214 mi) |
Track gauge | 1,520 mm (4 ft 11 27⁄32 in) Russian gauge |
Operating speed | various |
The Tashkent to Samarkand high-speed rail line is a 344-kilometre (214 mi) high-speed rail connection between Tashkent and Samarkand, the two largest Uzbek cities. The route passes through four provinces: Tashkent, Sirdaryo, Jizzakh and Samarqand in Uzbekistan. Trains operate seven days a week under the brand Afrosiyob.
Contents
History
Construction began on the line on 11 March 2011, with completion planned for later that year at a cost of approximately US$70 million.[1][2] The line includes both new and rebuilt trackage, as well as adding modern signaling systems to the route.[3] In addition to building trackage capable of supporting high-speed service, some track of lower standards was built to the cities of Bukhara and Khiva as part of the project.[2] The 344 kilometres (214 mi) high-speed line is capable of speeds up to 250 km/h (160 mph), with a total travel time between Tashkent and Samarkand of about two hours.[3] The line was planned to open for commercial operation in September 2011,[4] but suffered from delays.[5]
Operation
Two trainsets for operation on the line were ordered in November 2009 from Talgo at a cost of €38 million[2][6] The cost of the purchase was split between operator O'zbekiston Temir Yo'llari and a loan from the Fund for Reconstruction and Development of Uzbekistan.[3] The first trainset, a Talgo 250, was delivered to Tashkent on 22 July 2011.[6][7] Each trainset consists of two power cars, eight passenger cars with a capacity of 257 people and a dining car.[6] The second trainset arrived in Tashkent on 9 December 2011.[8] The train carried out its first trip from Tashkent to Samarkand on 26 August 2011.[9][10]
Commercial service started on 8 October 2011 twice a week under the brand Afrosiyob.[11][12] Initially, total travel time was still more than two and half-hours[13] but services were upgraded to five times a week in January 2012,[14] and daily services started from 13 February 2012.[15] The travel time has been reduced to 2:08 hours on 10 February 2013. [16]
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
External links
![]() |
Wikimedia Commons has media related to Afrosiyob. |
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 2.0 2.1 2.2 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 3.0 3.1 3.2 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Uzbekistan’s high-speed trains said to lack suitable tracks
- ↑ 6.0 6.1 6.2 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ First high-speed Talgo electricity train arrives in Tashkent, 24 July 2011
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Uzdaily: First high-speed electricity train carries out first trip from Samarkand and Tashkent, 27 August 2011
- ↑ Uzbekistan Launches High Speed Tashkent-Smarkand Rail Line, September 08 2011
- ↑ ГАЖК «Ўзбекистон темир йўллари», ОАО «Узжелдоропасс» оъявляет, что началась продажа проездных документов на высокоскоростной поезд «Afrosiyob»
- ↑ High-speed Afrosiyob train starts to run between Tashkent and Samarkand, 6 October 2011
- ↑ Uzbekistan Today: 2.5 Hours to Samarqand
- ↑ High-speed train Afrosiyob to run five times a week. UzDaily.com. 24 January 2012
- ↑ High-speed train Afrosiyob to run seven times a week. UzDaily.com. 13 February 2012
- ↑ Lua error in package.lua at line 80: module 'strict' not found.