Kilombero Bridge Daraja la Kilombero (Swahili) |
|
---|---|
File:Ifakara.Ferry.Kilombero-River.JPG
MV Kilombero Ferry
|
|
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Carries | 2 lanes |
Crosses | Ulanga River |
Locale | 5 km south of Ifakara, Tanzania |
Owner | Government of Tanzania |
Characteristics | |
Total length | 384 metres (1,260 ft) |
Width | 11.3 metres (37 ft) |
History | |
Engineering design by | NIMETA Consult (T) Ltd & Howard Humphreys (Tanzania) Ltd |
Constructed by | China Railway 15th Bureau Group Corporation |
Construction begin | November 2012 |
Construction end | October 2014 (projected) |
Construction cost | TZS 53.7 billion |
Kilombero Bridge is a bridge currently under construction in Tanzania.[1] It will link the towns of Ifakara and Mahenge. Construction work began in November 2012 and is expected to complete in 24 months.[2]
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
External links
<templatestyles src="Asbox/styles.css"></templatestyles>