Mauda Super Thermal Power Station
From Infogalactic: the planetary knowledge core
Mauda Super Thermal Power Station | |
---|---|
Location of the Mauda Super Thermal Power Station in Maharashtra, India
|
|
Country | India |
Location | Nagpur Maharashtra |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Status | Oprational |
Construction began | 2009 |
Commission date | Stage 1 on march 2013 and stage 2 is under erection |
Owner(s) | NTPC |
Thermal power station | |
Primary fuel | Coal |
Power generation | |
Units operational | 2 X 500. Under construction 2 X 660 MW |
Make and model | BHEL |
Nameplate capacity | 2,320 MW |
Mauda Super Thermal Power Station or NTPC Mauda is located at Mauda a Tehsil in Ramtek subdivision of Nagpur district in Nagpur revenue Division in the Berar region in the state of Maharashtra, India. The power plant is one of the coal based power plants of National Thermal Power Corporation. 1000MW Stage 1 was dedicated to nation by Prime Minister Narendra Modi on August 21, 2014.[1]
Bharat Heavy Electricals Limited (BHEL) is the EPC contractor (EPCC) for the power project.[2][3]
Capacity
Stage | Unit Number | Installed Capacity (MW) | Date of Commissioning | Status |
---|---|---|---|---|
1st | 1 | 500 | 2013 March | Running [4] |
2 | 500 | 2013 April | Running [5] | |
2nd | 3 | 660 | 2016 March | Running [6] |
4 | 660 | Under construction | ||
Total | Four | 2320 |
Gallery
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
<templatestyles src="Asbox/styles.css"></templatestyles>
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ NTPC commissions Unit-II of 500 MW of Mouda super thermal power project. Moneycontrol.com (April 01, 2013). Retrieved August 21, 2014.
- ↑ http://www.moneycontrol.com/news/business/ntpc-commissions-unit-3660-mw-at-mouda-stps_6036681.html