Silver State South Solar Project

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Silver State South Solar Project
Silver State South Solar Project is located in Nevada
Silver State South Solar Project
Location of Silver State South Solar Project in Nevada
Country United States
Location Clark County
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Status Under construction
Construction began September 3, 2014
Owner(s) First Solar
Solar field
Type Flat-panel PV
Site area 2,900 acres
Power generation
Nameplate capacity 250 MW

The 250 MW Silver State South Solar Project is a photovoltaic power station which is being constructed by subcontractors for First Solar.[1] Construction is expected to be complete in early 2016.[1] The plant will be owned and operated by a subsidiary of NextEra Energy Resources, and power will be sold to Southern California Edison.[2]

The project occupies approximately 2,900 acres of public lands[3] and is located adjacent to Primm, Nevada, in the Jean Lake/Roach Lake Special Recreation Management Area (SRMA).[4]

Production

Generation (MWh) [5]
Year November December Total
2015 342 8,211 8,595
Total 8,595

See also

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.

External links