Trenton Engine Plant is a Chrysler automobile factory in Trenton, Michigan. The north factory opened in 1952 while the south plant opened in 2010.

File:Chrysler Trenton Engine Plant.JPG
Chrysler Trenton North Engine Plant

Trenton Engine North Plant

The Trenton North Engine Plant opened in 1952 and underwent a major expansion in 1969.[1] Trenton engine was the site chosen for production of the 2.2 L four-cylinder engine which debuted in 1980 in the K-cars. The factory was expanded again in 1985 with a $150 million investment to add production of the 2.5 L four-cylinder in a 324,000-square-foot (30,100 m2) area formerly used for production of the Chrysler Slant 6 engine.

The Trenton Engine Plant produced all B and RB Chrysler Big Block V-8 Engines (361, 383, 400, 413, 426 and 440 cu. inch) from their introduction in 1957 until their demise in 1979.

In 1988, Chrysler sold much of the machining equipment, as well as a license to the design, to First Auto Works of China. The Trenton plant largely switched to the new Chrysler 3.3 engine production, while FAW continued to build the 2.2.

DaimlerChrysler reportedly invested $297 million in 2005 to expand the Trenton Engine plant to prepare to build a new 4.0 L version of the SOHC V6 and to revitalize the 3.8 line.

The plant ceased building engines in May 2011[1] and Chrysler announced that it would invest $114 million to repurpose one-fifth or nearly 400,000 square feet of the plant for the production of core components for the Pentastar V-6 engine. In November 2012, the Company announced that it would invest an additional $40 million to add a flexible production line that can run both the Pentastar engine and the Tigershark (I-4) engine.[1]

In May 2013, Trenton began producing the 3.2-liter Pentastar.[1]

Current products:[1]

Previous products

Trenton Engine South Plant

In 2007 Chrysler announced a new 822,000-square-foot (76,400 m2) engine plant to produce the Pentastar V6 engine. It has the annual capacity of 440,000 engines.[2] The new facility is LEED Gold certified, with features such as Zero-Waste-to-Landfill processes, the use of native grasses and trees on the property, higher performance insulation and more efficient manufacturing processes, fluorescent lighting, and efficient heating and cooling systems.[3] Overall, Chrysler expects to save approximately US$1,300,000 annually on energy costs while reducing annual CO2 emissions by 12,000 metric tons.

Current product:[1]

See also

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. http://trenton.patch.com/articles/chryslers-trenton-plant-leads-green