Tuas Crescent MRT Station
From Infogalactic: the planetary knowledge core
EW31
Tuas Crescent MRT Station 大士弯地铁站 துவாஸ் செம்பிறை Stesen MRT Tuas Sabit |
|||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Rapid transit | |||||||||||
File:Tuas Crescent Construction.jpg
Tuas Crescent MRT Station is under construction. Taken on April 2016.
|
|||||||||||
Location | 90 Pioneer Road Singapore 639608 |
||||||||||
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. | ||||||||||
Operated by | SMRT Trains (SMRT Corporation) | ||||||||||
Line(s) | Lua error in package.lua at line 80: module 'strict' not found. | ||||||||||
Platforms | Island | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Platform levels | 3 | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | EW31 | ||||||||||
History | |||||||||||
Opening | End-2016[1] | ||||||||||
Services | |||||||||||
|
|||||||||||
Location | |||||||||||
Tuas Crescent MRT Station (EW31) is an elevated Mass Rapid Transit station on the East West Line, part of the Tuas West Extension (TWE) in Singapore. This station is to provide rail connection to Tuas South and the central part of Tuas from the rest of the island.
History
It was first announced on 11 January 2011 by Transport Minister Mr Raymond Lim in a speech while visiting Bedok when new platform screen doors opened there. It is expected to be completed by 2016 and benefit an estimated 100,000 commuters daily.
According to Lianhe Zaobao, this station and the tracks linking it will be built in the middle of a vehicular bridge, the first ever in Singapore.
Station layout
L4 | Platform A | East West Line (future service) towards EW1 Pasir Ris via EW30 Gul Circle (→) |
|
||
Platform B | East West Line (future service) towards EW33 Tuas Link via EW32 Tuas West Road (←) | |
L2' | Concourse | Faregates, Ticketing Machines, Station Control |
L1 | Street Level | Exit/Entrance |
Transport connections
Destination | First Train | Last Train | ||||
---|---|---|---|---|---|---|
Mon – Sat | Sunday & Public Holiday |
Daily | ||||
East West Line | ||||||
to EW1 Pasir Ris | – | – | – | |||
to EW33 Tuas Link | – | – | – |
References
Lua error in package.lua at line 80: module 'strict' not found.